Rubros Globales (I, II, III) 2024 · LL SS 2024…
Proyecto Universalización del Saneamiento en el Uruguay.
Awarded
$ 33.511.638.277This contract has amounts in more than one currency.
Award
The state awarded the purchase. Supplier and amount are now known.
View on Compras EstatalesOpens the official record for this contract on comprasestatales.gub.uy.View award View tender
Who else bid
The open procurement data never says who else bid: it publishes only the winner. This comes from the award resolution, which sometimes lists them. When this panel is absent, the resolution did not say — not that there was no competition.
4 offers were received
- C I E M S A CONSTRUCCIONES E INSTALACIONES ELECTROMawarded
- FAST INDUSTRIA E COMERCIO LTDAawarded
- SACEEMawarded
- TEYMA URUGUAY S Aawarded
Summary
Buyer · Procuring entity
Administración de las Obras Sanitarias del EstadoPNLuis Lacalle Pou2020–2025
Supplier
SACEEMSupplier
TEYMA URUGUAY S ASupplier
FAST INDUSTRIA E COMERCIO LTDAWhat was bought
Awarded items with quantity and unit price.
416 of 416
- Award no.
- R/210002980010
- Award date
- 10 may. 2024
- Award status
- Active
- Supplier
- SACEEM
| Description | Code | Quantity | Unit | Unit price | Total |
|---|---|---|---|---|---|
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 Rub.Glob (I,II,III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste 2024 Rub.Glob (I,II,III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LLSS 2024 Rub.Glob (I,II,III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LLSS imprev. 2024 Rub.Glob (I,II,III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto Rub.Glob (I,II,III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Rub.Glob (I,II,III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LLSS Rub.Glob (I,II,III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LLSS imprev. Rub.Glob (I,II,III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto Rub.Glob (I,II,III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Rub.Glob (I,II,III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LLSS Rub.Glob (I,II,III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LSS imprev. Rub.Glob (I,II,III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto Rub.Glob (I,II,III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Rub.Glob (I,II,III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LLSS Rub.Glob (I,II,III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LSS imprev. Rub.Glob (I,II,III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom.2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| ajuste 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom.2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| ajuste 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom.2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom.2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom.2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom.2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (IV - Op. Y Mant.) 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (IV - Op. Y Mant.) 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (IV - Op. Y Mant.) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 Rub.Glob (I,II,III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste 2024 Rub.Glob (I,II,III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LLSS 2024 Rub.Glob (I,II,III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LLSS imprev. 2024 Rub.Glob (I,II,III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto Rub.Glob (I,II,III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Rub.Glob (I,II,III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LLSS Rub.Glob (I,II,III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LLSS imprev. Rub.Glob (I,II,III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto Rub.Glob (I,II,III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Rub.Glob (I,II,III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LLSS Rub.Glob (I,II,III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LSS imprev. Rub.Glob (I,II,III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto Rub.Glob (I,II,III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Rub.Glob (I,II,III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LLSS Rub.Glob (I,II,III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LSS imprev. Rub.Glob (I,II,III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom.2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| ajuste 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom.2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| ajuste 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom.2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom.2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom.2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom.2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (IV - Op. Y Mant.) 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (IV - Op. Y Mant.) 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (IV - Op. Y Mant.) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
- Award no.
- R/211057180014
- Award date
- 10 may. 2024
- Award status
- Active
- Supplier
- C I E M S A CONSTRUCCIONES E INSTALACIONES ELECTROM
| Description | Code | Quantity | Unit | Unit price | Total |
|---|---|---|---|---|---|
| Rubros Globales (I, II, III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Paramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| O Y M 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| O Y M 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
- Award no.
- R/211096770013
- Award date
- 10 may. 2024
- Award status
- Active
- Supplier
- TEYMA URUGUAY S A
| Description | Code | Quantity | Unit | Unit price | Total |
|---|---|---|---|---|---|
| Ajuste Pramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| O y M 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| O y M 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2029 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios S/Conex. Intradom. 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Pramétrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevistos 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Unitarios Conex. Intradom. 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Ajuste Parametrico 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| LL SS Imprevisto 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| O y M 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2028 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| O Y M 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| O Y M 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| IMPREVISO OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| AJUSTE OYM 2027 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
- Award no.
- X/BRA00771598/0001-12
- Award date
- 10 may. 2024
- Award status
- Active
- Supplier
- FAST INDUSTRIA E COMERCIO LTDA
| Description | Code | Quantity | Unit | Unit price | Total |
|---|---|---|---|---|---|
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2024 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2025 | Code0 | Quantity1 | UnitUS | Unit price | Total |
| Rubros Globales (I, II, III) 2026 | Code0 | Quantity1 | UnitUS | Unit price | Total |
Other awards from this agency
View allAmount detail and record origin
Amount detail
- UYU
- $ 30.266.489.896,64
- USD
- US$ 81.031.355,00 USD
- Items
- 416
- Currencies
- UYU · USD
- Original amount in pesos
- $ 30.266.489.896,64
- Includes conversion
- Yes
- Exchange rate as of
- 10 ago. 2025
Record origin
- Initiation type
- Tender
- Source OCDS document
- https://www.comprasestatales.gub.uy/ocds/release/adjudicacion-i410825