☢️Cancer and high-cost care· 2018-2023
ASSE bought three accelerators without the software to run them
The 2018 tender left out treatment-planning and dosimetry software, El Observador reported. Two of the three machines went almost five years unused.
Figure published by the sources
US$ 3.975.000 por tres aceleradores lineales según El Observador (marzo de 2023); en su nota de diciembre de 2020 el mismo diario consignó US$ 3.750.000 «como surge de la página web de compras estatales»
Bodies involved
Administración de los Servicios de Salud del Estado (ASSE) · Instituto Nacional del Cáncer · Hospital de Tacuarembó · Centro Hospitalario Pereira Rossell
What it is
In 2018 ASSE awarded Tera Ingenieros SRL, the Uruguayan representative of manufacturer Varian, the purchase of three linear accelerators for radiotherapy, according to El Observador. The machines were destined for the National Cancer Institute (INCA), Tacuarembó Hospital and the Pereira Rossell Hospital Centre. On the price, the paper's own reports do not agree: in December 2020 it gave US$3,750,000 "as shown on the state procurement website", and in March 2023 US$3,975,000. At the time the public sector was treating patients with very old machines: the Tacuarembó unit was 23 years old and INCA was using an accelerator leased since 2014 that was 15 years old. On the Pereira Rossell machine, the same 2020 report says in one passage that it was 17 years old and quotes an email from the centre's director, Victoria Lafluf, saying the machine in operation "has 26 years of useful life and shows habitual technical faults".
What is questioned
El Observador reported on 14 December 2020 that the tender had not included the treatment planning system (TPS), the external dosimetry systems or the quality-control programs, without which the accelerators cannot be used on patients; the paper estimated the missing items at around US$500,000. On 14 March 2023 the same outlet reported that the machines still lacked an operating authorisation from the National Radiation Protection Regulatory Authority, that Pereira Rossell had not built the bunker —so the equipment sat in crates for months— and that in Tacuarembó the director requested an inspection over a gas leak, with the warranty already expired. On 12 July 2023 El Observador reported that negotiating preventive maintenance with Tera Ingenieros, the country's sole supplier of that service, took more than four years: the company asked for 12% to 15% a year of the equipment's value —over US$1 million a year— and it closed at around 8.3%, some US$600,000 a year. The president of ASSE, Leonardo Cipriani, described the process: "It was a breech birth, truly cramping". The sources consulted carry ASSE's explanation but include no response from Tera Ingenieros.
Why it matters to you
Between 2018 and 2023, ASSE patients who needed radiotherapy kept being treated with machines two decades old or more while new, already-paid-for units waited. In radiotherapy, time is not neutral: every month of delay is a month of treatment delivered with less precise technology over the healthy tissue surrounding the tumour.
Where it stands
On 23 November 2023, according to Presidencia, ASSE presented INCA's new radiotherapy machine and reported that "the investment to make this equipment operational was 1,336,000 dollars"; it added that another unit would go to Pereira Rossell and be operational in December, and that the Tacuarembó machine was already running. Montevideo Portal reported that the Tacuarembó equipment cost around US$1,300,000 and that, with the purpose-built bunker, the infrastructure totals more than US$2 million in investment. As of this file's closing date (August 2026) the sources consulted record nothing after November 2023 on any administrative responsibility for the tender omission.
The open-data cross-reference
What the state awarded to the bodies and companies named in this file, according to the official Compras Estatales data. It is a cross-reference for scale, not proof of irregularity: it includes contracts nobody questioned.
How this cross-reference was builtcontracts whose object mentions “acelerador lineal” · everything recorded under 89 buying units of the named bodies (not only this case) · between 2018 and 2023
Who was paid
Suppliers ranked by amount awarded in the cross-reference. A contract with several suppliers counts in full against each one: this is a ceiling, not a split.
Which body paid
What it bought
Spending by category, from price times quantity of each awarded item, in the contract currency.
Contracts per year
The detail
The largest contracts in the cross-reference, high to low. Tap one for its record and the link to the official purchase.
- ACELERADOR LINEALTERA INGENIEROS S R L · 28 dic. 2018$ 150 M
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 28 nov. 2023$ 55,5 M
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)CENTRO DE ONCOLOGIA Y RADIOTERAPIA DEL LITORAL LTD · 19 mar. 2018$ 14,7 M
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 11 ago. 2023$ 2,7 M
- REPUESTO Y/O ACCESORIO PARA ACELERADOR LINEALTERA INGENIEROS S R L · 17 dic. 2021$ 2,6 M
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 09 jul. 2020$ 443.705
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 13 dic. 2019$ 390.803
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 15 nov. 2019$ 334.533
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 11 set. 2019$ 322.922
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 19 mar. 2022$ 290.000
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 30 jul. 2019$ 286.887
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 17 jun. 2020$ 283.322
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 09 nov. 2021$ 274.500
- REPUESTO Y/O ACCESORIO PARA ACELERADOR LINEALTERA INGENIEROS S R L · 10 set. 2020$ 259.000
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 02 jul. 2019$ 247.356
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 14 may. 2021$ 238.262
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 29 may. 2020$ 237.189
- REPUESTO Y/O ACCESORIO PARA ACELERADOR LINEALTERA INGENIEROS S R L · 08 ene. 2018$ 236.900
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 25 may. 2020$ 229.201
- REPUESTO Y/O ACCESORIO PARA ACELERADOR LINEALAGA S A · 10 may. 2018$ 227.192
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 22 ago. 2019$ 224.709
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 21 oct. 2019$ 217.086
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 15 jun. 2021$ 213.525
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)CENTRO DE ONCOLOGIA Y RADIOTERAPIA DEL LITORAL LTD · 12 jul. 2019$ 211.680
- APLICACIONES DE RADIOTERAPIA CON ACELERADOR LINEAL (ALTA ENERGIA)COOPERATIVA MEDICA DE FLORIDA IAMPP · 07 ene. 2020$ 205.619
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 01 jun. 2023$ 198.000
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 27 jul. 2020$ 198.000
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 08 oct. 2022$ 195.000
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 15 jul. 2019$ 195.000
- MANTENIMIENTO DE ACELERADOR LINEALTERA INGENIEROS S R L · 14 ago. 2021$ 192.213
Amounts in pesos, normalised. Records with impossible quantities are excluded from the total. Open-data cross-referencing can show the 2018 purchase and the later maintenance contracts published on Compras Estatales, but not the civil works for the bunkers or the technical-assistance agreements, which may be processed through other channels. The price discrepancy between the two El Observador reports is not resolved in the sources.